AI-driven demand is transforming data centres into core real assets, with power accessibility now the defining constraint for development and valuation. Korea faces acute grid limitations in the Greater Seoul Area, accelerating a shift toward regional markets supported by Distributed Energy Act. As workloads diverge, power-intensive AI training is moving to non-GSA regions with ample grid capacity, while low-latency inference remains concentrated in metropolitan areas. Long-term competitiveness depends not only on securing stable power but also on adopting flexible energy solutions aligned with evolving policy and technology needs.
Instant Insight #3 Data Centres & The Power Challenge
Suki Kim • 08/01/2026
Recent Insights
Research • Supply Chain
The 2026 Korea Logistics Market Report examines the turn in the supply cycle, the structural shift in demand toward larger, higher-spec assets across wider geographies, and the concentration of investment activity in core assets, with in-depth analysis by submarket.
Suki Kim • 05/06/2026
Insights • Investment / Capital Markets
Instant Insight #2 Asia REIT Market
Since 2019, Korea’s REITs have experienced rapid growth, primarily led by large corporate-sponsored vehicles.
Suki Kim • 04/09/2025
Insights • Investment / Capital Markets
Instant Insight #1 Office Fit Out Cost Guide
In Korea, higher construction costs have pushed up rents for new buildings.
Suki Kim • 09/06/2025